Saturday, January 17, 2009

Work Day and Downtown San Jose





The work day involved making concrete and filling up 7 columns. Also a group painted the library cabinets and touching up some of the classrooms. Wheaton Acamdemy filling up the new building's floors with gravel and compacting it down.
We did go downtown to San Jose to experience that. A lot of people going everywhere. Stopped off for some coffee at a hotel, checked out a souvenir place, and ate out a a Denny's type of fish place.
We came back to the school and the water was shut off because the tank at school was running low and needed to be replenished. Water came back on in the AM.
Another rat met his or her demise overnight, I didn't look.
Today will be more of the same as Friday. The painters will use a sprayer today for the book shelves.
The group from Wheaton Acacdemy will be leaving later today back to Wheaton.
I will update the blog before we catch our flight back on Sunday afternoon.
Wally<><